Which statement is correct about node synchronization?
Answer : D
Node synchronization is a process of keeping the NFM-T database in sync with the nodes in the network. The synchronization process will download all the items from the node, including NE parameters, ports, alarms, internal links, etc., to the NFM-T database. This ensures that the NFM-T database is up to date and the network is running efficiently.
How is it possible to check the activation status of GMRE on a node?
Answer : C
The GMRE activation status is reported in the supervision state column on the node list. The supervision state column displays the GMRE status of the node, which is either 'Activated' or 'Not Activated'. This allows the user to quickly check the GMRE activation status of a node without having to ping the node from the NFM-T platform.
Which macro steps can be executed via CPB?
Answer : A
Node creation, systems validation and system provisioning. The CPB (Commissioning Parameter Builder) application is used to generate commissioning files for a Nokia 1830 Photonic Service Switch (PSS-1) and can be used to create new nodes, validate the system configuration, and provision the system with the appropriate settings and parameters. Power adjustment and generation of system loss report are not related to CPB.
How are the EPT systems related to NFM-T when CPB is performed?
Answer : C
The EPT systems are displayed on the CPB (Commissioning Parameter Builder) panel and they can be individually selected. This allows the user to configure the network elements in the network and provision them according to their specific requirements. The systems are not reported on CPB, but through the Equipment Manager. The Equipment Manager is the interface used to configure the network elements and the EPT systems. The NFM-T is not related to the CPB and does not affect the CPB process.