SAP - Exclusive Limited Time Discount Offer - Ends In 00:00:00 Coupon code: 30OFF
  1. Home
  2. SAP
  3. C_TSCM42_67 Exam

Free C_TSCM42_67 Questions for SAP C_TSCM42_67 Exam as PDF & Practice Test Software

Page:    1 / 14   
Total 106 questions

Question 1

Which data forms the basis for calculating the capacity requirement for an operation?

(Choose three.)



Answer : A, D, E

Question 2

A user you advise wishes to transfer variable process instructions for automated processing directly to certain work centers and machines in the production department (for example, feed speed, pressing pressure, dry temperature). The user also wishes to receive variable as-is messages (such as actual quantities, actual times) from these work centers and machines and to process these messages for feedback concerning production orders. Which of the following options would you recommend to implement these requirements?



Answer : A

Question 3

An enterprise wants to use SAP ECC requirements planning together with the NETPL procedure (net change planning in the planning horizon). The planning horizon is to be set equally for all materials by default. However, some materials are to be given a different planning horizon.

What procedure would you recommend to the project team for setting the planning horizon on the system side?



Answer : B

Question 4

The master data for an in-house production process is to be set up in the SAP ECC system. To do this, you should create a suitable routing that plans for five operations in an initial sequence (10, 20, 30, 40, 50). There should be an option of relocating operations 30 and 40 to a second sequence on other work centers if there are capacity bottlenecks. What sequence type would you use to create the second sequence in the system?



Answer : B

Question 5

Which of the following are properties of ECC Multi-Site Planning? (Choose two.)



Answer : A, D

Page:    1 / 14   
Total 106 questions