VMware - Big Savings Alert – Don’t Miss This Deal - Ends In 1d 00h 00m 00s Coupon code: 26Y30OFF
  1. Home
  2. VMware
  3. 3V0-32.23 Exam
  4. Free 3V0-32.23 Questions

Free Practice Questions for VMware 3V0-32.23 Exam

Pass4Future also provide interactive practice exam software for preparing VMware Cloud Management and Automation Advanced Design (3V0-32.23) Exam effectively. You are welcome to explore sample free VMware 3V0-32.23 Exam questions below and also try VMware 3V0-32.23 Exam practice test software.

Page:    1 / 14   
Total 86 questions

Question 1

Which three products can be deployed with VMware Aria Suite Lifecycle? (Choose three.)



Answer : A, B, D

VMware Aria Suite Lifecycle can deploy and manage VMware Aria Operations, VMware Aria Operations for Applications, and VMware Aria Operations for Logs as part of the integrated cloud management platform.


Question 2

An architect is designing the VMware Aria Operations component of a Cloud Management solution. The following information has been provided by the customer:

The solution must support the monitoring of virtual machines across three physical sites.

The latency between each physical site is less than 10ms.

The solution must be resilient to a site failure.

The solution should be resilient to a failure within a site.

Which two design decisions should the architect document to meet the requirements? (Choose two.)



Answer : B, C

Continuous Availability enables a single resilient cluster across multiple sites, protecting against site failure with low latency (<10 ms). Alternatively, deploying a separate cluster in each site with High Availability protects against failures within each site. Both approaches satisfy the requirements for resilience at both site and node levels.


Question 3

An architect is designing the authentication and identity management component of a private cloud solution and has gathered the following information from the customer.

Single forest multi-domain Active Directory deployment.

Solution must be highly available.

Which approach can the architect take to achieve this?



Answer : B

A clustered deployment of Workspace One Access ensures high availability. Configuring it as a Single Active Directory Integrated Windows Authentication (IWA) directory type allows seamless authentication across a single forest with multiple domains, supporting both high availability and the customer's AD topology requirements.


Question 4

Which two design decisions would an architect document as part of the physical design? (Choose two.)



Answer : A, D

Physical design decisions document specific details about component placement and sizing in the infrastructure. Deploying Remote Collectors in each location and specifying the analytics cluster size (three Large nodes) are concrete, implementation-level details that belong in the physical design.


Question 5

After an organization completed an audit of their vSphere environment, they found that virtual machine deployments weren't consistent. They weren't using appropriate vSphere tags, resulting in confusion around who owned what virtual machines. Going forward Aria Automation has been chosen to bring consistency to their deployments and day two management. The organization wants to make sure the resources of each department are tagged appropriately.

Which two options will meet the technical requirements? (Choose two.)



Answer : C, E

Creating a project for each department and defining resource tags in each project ensures resources are automatically and consistently tagged per department during deployment, meeting the organization's requirements for ownership and consistency.


Page:    1 / 14   
Total 86 questions